The project Swiming pool with Gym has been created with the vision of active rest and relaxation. The swimming pool has been designed for Bytca district which represent 5 000 -- 10 000 people. The building has two floors. First floor is public and in basement there is located technical equipment. Building SO 01 is situated on the ground plot 2392/8 with area of 19 715 m. The entrance to the building is from North side where is foyer -- reception. From there dressing room, showers and toilets for gym devided into men's and women's are available. There is also located head office and entrance to the gym from which is available storage of sports equipment. From the reception there is access to the passage where is entrance to the men's and women's dress rooms, toilets and shower filter for entry to the swimming pool . There are also located dress rooms, toilets and showers for disabled visitors. From swimming pool there is available shipboy room and welness (finnish sauna, jacuzzi). In basement there is launderette with kiln and storage for clean clothes. There is place for technical equipment for swimming pool water fitration, under pool where water from swimming pool is repumping and boiler. Whole building is integrated to the grounds with slope character. The building is monolithic skeleton based on iron concrete lines. Underground there are iron concrete bearing walls with thickness of 300 and 500 mm. On first floor there are pillars 300/300, between the pillars there is ceramics stall with thickness of 300 mm and spoke are walled from preform with thickness of 115 mm. The roof is founded on girder 300/500 and roof girder components are prefabricated prestressed TT panels. First floor and basement are jointed by one iron concrete staircase. Light hight of floors is 4,000 mm.